RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2809031476 - Archived data from Tue, 11. August 2020 17:39:31 CEST


This is all the information about APD 2809031476. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2809031476
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G05
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 386.6 V
Dark current: 7.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 88
Position in Box: 40
EP1 batch: 78
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.5694984 V     T = -25 °C: 349.6433516 V
Voltage for Gain 150: T = +20 °C: 393.3744135 V     T = -25 °C: 357.1337002 V
Voltage for Gain 200: T = +20 °C: 397.6753469 V     T = -25 °C: 361.3288912 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.400726875 V-1     T = -25 °C: 4.949794472 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.595901561 V-1     T = -25 °C: 9.151064705 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.11383203 V-1     T = -25 °C: 16.24728294 V-1
Break-through voltage: T = +20 °C: 411.4646879 V     T = -25 °C: 375.5711312 V
   
Notes:


Version history

Time Author Change comment
14. Apr 2021 18:52:01 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:39 CET jreher Updated box and position via API.
05. Feb 2021 10:59:42 CET jreher Updated box and position via API.
03. Feb 2021 18:25:11 CET jreher Updated box and position via API.
11. Aug 2020 17:39:31 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:44:28 CET jreher Updated APD location via API.
25. Nov 2019 17:17:56 CET jreher Updated box and position via API.
13. Sep 2019 10:30:41 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:02:31 CEST markus.moritz
25. Jul 2019 12:10:53 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:58 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:39 CET Tobias Corrected dark current unit.
20. Jun 2018 13:35:58 CEST Tobias Imported from Hamamatsu datasheet.