RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2809031475 - Archived data from Tue, 11. August 2020 17:39:30 CEST


This is all the information about APD 2809031475. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2809031475
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B05
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 386.5 V
Dark current: 9.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 88
Position in Box: 39
EP1 batch: 78
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.9282495 V     T = -25 °C: 350.8997552 V
Voltage for Gain 150: T = +20 °C: 394.7699839 V     T = -25 °C: 358.4232088 V
Voltage for Gain 200: T = +20 °C: 399.1061059 V     T = -25 °C: 362.6211384 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.630456772 V-1     T = -25 °C: 4.863768672 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.193206145 V-1     T = -25 °C: 8.911613344 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.38351159 V-1     T = -25 °C: 15.6940436 V-1
Break-through voltage: T = +20 °C: 413.8034752 V     T = -25 °C: 377.4851704 V
   
Notes:


Version history

Time Author Change comment
19. Nov 2021 13:05:29 CET oafedulidis Assigned to capsule by script
16. Jun 2021 16:04:40 CEST oafedulidis Updated box and position via API.
16. Jun 2021 16:00:51 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:53:35 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:59:42 CET jreher Updated box and position via API.
03. Feb 2021 18:25:11 CET jreher Updated box and position via API.
11. Aug 2020 17:39:30 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:44:28 CET jreher Updated APD location via API.
25. Nov 2019 17:17:56 CET jreher Updated box and position via API.
13. Sep 2019 10:30:41 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:01:57 CEST markus.moritz
25. Jul 2019 12:10:53 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:58 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:39 CET Tobias Corrected dark current unit.
20. Jun 2018 13:35:58 CEST Tobias Imported from Hamamatsu datasheet.