RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2809031472 - Archived data from Fri, 05. February 2021 10:59:42 CET


This is all the information about APD 2809031472. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2809031472
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D06
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.3 V
Dark current: 9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 88
Position in Box: 36
EP1 batch: 78
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.5183145 V     T = -25 °C: 347.7436438 V
Voltage for Gain 150: T = +20 °C: 391.3536388 V     T = -25 °C: 355.1345328 V
Voltage for Gain 200: T = +20 °C: 395.7025811 V     T = -25 °C: 359.27834 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.434872717 V-1     T = -25 °C: 4.998034244 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.675332267 V-1     T = -25 °C: 9.32241526 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.09538908 V-1     T = -25 °C: 14.76191844 V-1
Break-through voltage: T = +20 °C: 410.8302492 V     T = -25 °C: 374.2572436 V
   
Notes:


Version history

Time Author Change comment
29. Mar 2022 12:38:07 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 10:31:29 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:59:42 CET jreher Updated box and position via API.
03. Feb 2021 18:25:11 CET jreher Updated box and position via API.
11. Aug 2020 17:39:30 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:44:27 CET jreher Updated APD location via API.
25. Nov 2019 17:17:56 CET jreher Updated box and position via API.
13. Sep 2019 10:30:41 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:00:36 CEST markus.moritz
25. Jul 2019 12:10:53 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:58 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:39 CET Tobias Corrected dark current unit.
20. Jun 2018 13:35:58 CEST Tobias Imported from Hamamatsu datasheet.