Show Hamamatsu Avalanche Photo Diode 2808031427 - Archived data from Tue, 11. August 2020 17:39:25 CEST
This is all the information about APD 2808031427. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 2808031427 |
| Type: | Hamamatsu Avalanche Photo Diode |
| Detector: | unassigned |
| Unit: | unassigned |
| Preamp: | 0 |
| Current location: | Bochum |
| Installation information: | |
| Label: | none |
| Manufacturer information: | |
| Wafer position: | D15 |
| Break-through voltage: | 413 V |
| Voltage for Gain 100 (T=+25°C): | 386.9 V |
| Dark current: | 17.8 nA |
| Screening Logistics: | |
| Available: | Yes |
| Storage Box: | 88 |
| Position in Box: | 12 |
| EP1 batch: | 77 |
| EP1 batch after irradiation: | none |
| Shipment: | |
| Grid number: | none |
| Position in grid: | none |
| Arrival for irradiation: | 26. Aug 2019 |
| Sent for analysis after irradiation: | 02. Sep 2019 |
| Return for assembly: | none |
| Irradiation: | |
| Date: | 28. Aug 2019 |
| Dose used: | 37 Gy |
| Temperature: | 20 °C |
| Position: | none |
| Bias voltage: | none |
| Annealing: | |
| Date: | 31. Aug 2019 |
| Temperature: | 80 °C |
| Duration: | 48 h |
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: 387.2514255 V T = -25 °C: 351.052985 V |
| Voltage for Gain 150: | T = +20 °C: 395.0790589 V T = -25 °C: 358.553306 V |
| Voltage for Gain 200: | T = +20 °C: 399.4094926 V T = -25 °C: 362.7267692 V |
| Gain/Voltage slope at M = 100: | T = +20 °C: 4.526423719 V-1 T = -25 °C: 4.837226093 V-1 |
| Gain/Voltage slope at M = 150: | T = +20 °C: 8.980186645 V-1 T = -25 °C: 8.907062552 V-1 |
| Gain/Voltage slope at M = 200: | T = +20 °C: 14.08879122 V-1 T = -25 °C: 15.83825233 V-1 |
| Break-through voltage: | T = +20 °C: 412.0848885 V T = -25 °C: 375.8665037 V |
| Notes: |
Version history
| Time | Author | Change comment |
|---|---|---|
| 05. Feb 2021 10:59:39 CET | jreher | Updated box and position via API. |
| 03. Feb 2021 18:25:08 CET | jreher | Updated box and position via API. |
| 11. Aug 2020 17:39:25 CEST | jreher | Updated APD characteristics via API. |
| 27. Nov 2019 19:44:26 CET | jreher | Updated APD location via API. |
| 25. Nov 2019 17:17:54 CET | jreher | Updated box and position via API. |
| 13. Sep 2019 10:30:22 CEST | jgrochowski | Updated APD batch assignment via API. |
| 04. Sep 2019 13:19:30 CEST | markus.moritz | |
| 25. Jul 2019 12:11:09 CEST | spankonin | Updated APD batch assignment via API. |
| 05. Jul 2019 13:47:56 CEST | jreher | Updated APD location via API. |
| 03. Jan 2019 00:13:38 CET | Tobias | Corrected dark current unit. |
| 20. Jun 2018 13:35:56 CEST | Tobias | Imported from Hamamatsu datasheet. |