RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2808031419 - Archived data from Fri, 05. February 2021 10:59:38 CET


This is all the information about APD 2808031419. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2808031419
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C07
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.2 V
Dark current: 10.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 88
Position in Box: 5
EP1 batch: 77
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.6082847 V     T = -25 °C: 347.8320517 V
Voltage for Gain 150: T = +20 °C: 391.4099985 V     T = -25 °C: 355.1802765 V
Voltage for Gain 200: T = +20 °C: 395.7343456 V     T = -25 °C: 359.3078257 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.458894449 V-1     T = -25 °C: 5.028326268 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.708563455 V-1     T = -25 °C: 9.404482522 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.31462526 V-1     T = -25 °C: 14.88222499 V-1
Break-through voltage: T = +20 °C: 410.8191757 V     T = -25 °C: 374.2523269 V
   
Notes:


Version history

Time Author Change comment
16. Feb 2021 12:25:44 CET jreher Updated box and position via API.
15. Feb 2021 15:40:07 CET jreher Assigned to capsule by script
05. Feb 2021 10:59:38 CET jreher Updated box and position via API.
03. Feb 2021 18:25:07 CET jreher Updated box and position via API.
11. Aug 2020 17:39:24 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:44:25 CET jreher Updated APD location via API.
25. Nov 2019 17:17:53 CET jreher Updated box and position via API.
13. Sep 2019 10:30:21 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:16:18 CEST markus.moritz
25. Jul 2019 12:11:09 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:56 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:38 CET Tobias Corrected dark current unit.
20. Jun 2018 13:35:56 CEST Tobias Imported from Hamamatsu datasheet.