RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2808031416 - Archived data from Wed, 03. February 2021 18:25:07 CET


This is all the information about APD 2808031416. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2808031416
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B11
Break-through voltage: 418 V
Voltage for Gain 100 (T=+25°C): 390.6 V
Dark current: 9.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 88
Position in Box: 2
EP1 batch: 77
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 391.2740088 V     T = -25 °C: 354.7947639 V
Voltage for Gain 150: T = +20 °C: 399.0498084 V     T = -25 °C: 362.333537 V
Voltage for Gain 200: T = +20 °C: 403.3577298 V     T = -25 °C: 366.5385214 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.514409153 V-1     T = -25 °C: 4.867210482 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.994858009 V-1     T = -25 °C: 8.972660743 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.10556058 V-1     T = -25 °C: 15.92174044 V-1
Break-through voltage: T = +20 °C: 417.3300078 V     T = -25 °C: 381.0232725 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:38 CET jreher Updated box and position via API.
03. Feb 2021 18:25:07 CET jreher Updated box and position via API.
11. Aug 2020 17:39:23 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:44:25 CET jreher Updated APD location via API.
25. Nov 2019 17:17:52 CET jreher Updated box and position via API.
13. Sep 2019 10:30:21 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:14:57 CEST markus.moritz
25. Jul 2019 12:11:08 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:55 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:38 CET Tobias Corrected dark current unit.
20. Jun 2018 13:35:56 CEST Tobias Imported from Hamamatsu datasheet.