RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2806031292 - Archived data from Fri, 05. February 2021 10:59:34 CET


This is all the information about APD 2806031292. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2806031292
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D09
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.2 V
Dark current: 8.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 296
Position in Box: 49
EP1 batch: 76
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.526693 V     T = -25 °C: 343.3469753 V
Voltage for Gain 150: T = +20 °C: 386.3411249 V     T = -25 °C: 350.6782273 V
Voltage for Gain 200: T = +20 °C: 390.6950274 V     T = -25 °C: 354.7771418 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.467290378 V-1     T = -25 °C: 4.831039088 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.707471531 V-1     T = -25 °C: 9.899231368 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.1176982 V-1     T = -25 °C: 15.88490605 V-1
Break-through voltage: T = +20 °C: 405.7518455 V     T = -25 °C: 369.6592095 V
   
Notes:


Version history

Time Author Change comment
29. Mar 2022 12:39:11 CEST oafedulidis Assigned to capsule by script
16. Jun 2021 16:03:09 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:59:34 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:52:11 CEST oafedulidis Updated box and position via API.
21. Apr 2021 14:48:08 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:59:34 CET jreher Updated box and position via API.
03. Feb 2021 18:25:03 CET jreher Updated box and position via API.
11. Aug 2020 17:39:22 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:44:17 CET jreher Updated APD location via API.
25. Nov 2019 17:17:50 CET jreher Updated box and position via API.
13. Sep 2019 10:30:21 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:11:59 CEST markus.moritz
25. Jul 2019 12:11:26 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:50 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:38 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:06:18 CEST Tobias Imported from Hamamatsu datasheet.