RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2806031282 - Archived data from Fri, 18. December 2020 14:00:52 CET


This is all the information about APD 2806031282. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2806031282
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B04
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380 V
Dark current: 6.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 87
Position in Box: 36
EP1 batch: 76
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.471226 V     T = -25 °C: 345.3602279 V
Voltage for Gain 150: T = +20 °C: 388.3642266 V     T = -25 °C: 352.7723489 V
Voltage for Gain 200: T = +20 °C: 392.7700595 V     T = -25 °C: 356.9259789 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.433592298 V-1     T = -25 °C: 4.770825844 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.588492949 V-1     T = -25 °C: 9.719752505 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.84040596 V-1     T = -25 °C: 15.40026263 V-1
Break-through voltage: T = +20 °C: 408.1761266 V     T = -25 °C: 371.9365359 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:08:04 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 10:59:33 CET jreher Updated box and position via API.
03. Feb 2021 18:25:02 CET jreher Updated box and position via API.
18. Dec 2020 14:00:52 CET jreher Updated box and position via API.
11. Aug 2020 17:39:21 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:44:16 CET jreher Updated APD location via API.
25. Nov 2019 17:17:50 CET jreher Updated box and position via API.
13. Sep 2019 10:30:00 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:07:47 CEST markus.moritz
25. Jul 2019 12:11:25 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:50 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:37 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:06:15 CEST Tobias Imported from Hamamatsu datasheet.