RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2806031273 - Archived data from Tue, 11. August 2020 17:39:20 CEST


This is all the information about APD 2806031273. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2806031273
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2302024267/2806031273
Unit: #1130 (barcode 1309012176)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 378.6 V
Dark current: 7.7 nA
   
Screening Logistics:  
Available: No
Storage Box: 87
Position in Box: 31
EP1 batch: 76
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.8003831 V     T = -25 °C: 343.5266927 V
Voltage for Gain 150: T = +20 °C: 386.653402 V     T = -25 °C: 350.9191891 V
Voltage for Gain 200: T = +20 °C: 391.0304865 V     T = -25 °C: 355.0769816 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.697934192 V-1     T = -25 °C: 4.749207592 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.220021422 V-1     T = -25 °C: 9.507443673 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.2693243 V-1     T = -25 °C: 14.97090289 V-1
Break-through voltage: T = +20 °C: 407.1259438 V     T = -25 °C: 370.6558467 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:33 CET jreher Updated box and position via API.
03. Feb 2021 18:25:02 CET jreher Updated box and position via API.
11. Aug 2020 17:39:20 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:59:54 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:33 CET jreher Updated box and position via API.
27. Nov 2019 19:44:16 CET jreher Updated APD location via API.
25. Nov 2019 17:17:49 CET jreher Updated box and position via API.
13. Sep 2019 10:30:00 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:05:24 CEST markus.moritz
25. Jul 2019 12:11:25 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:49 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:37 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:06:12 CEST Tobias Imported from Hamamatsu datasheet.