RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2806031272 - Archived data from Tue, 11. August 2020 17:39:20 CEST


This is all the information about APD 2806031272. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2806031272
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1910021019/2806031272
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D03
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.7 V
Dark current: 6.8 nA
   
Screening Logistics:  
Available: No
Storage Box: 87
Position in Box: 30
EP1 batch: 76
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.1404133 V     T = -25 °C: 344.9357818 V
Voltage for Gain 150: T = +20 °C: 388.0238135 V     T = -25 °C: 352.3340862 V
Voltage for Gain 200: T = +20 °C: 392.4426022 V     T = -25 °C: 356.4945173 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.539128988 V-1     T = -25 °C: 4.941572439 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.831405399 V-1     T = -25 °C: 9.118567284 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.33858554 V-1     T = -25 °C: 16.16910489 V-1
Break-through voltage: T = +20 °C: 407.4061023 V     T = -25 °C: 371.0949949 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:33 CET jreher Updated box and position via API.
03. Feb 2021 18:25:02 CET jreher Updated box and position via API.
11. Aug 2020 17:39:20 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:53:47 CEST jreher Assigned to capsule by script
13. Feb 2020 14:22:52 CET jreher Updated box and position via API.
27. Nov 2019 19:44:16 CET jreher Updated APD location via API.
25. Nov 2019 17:17:49 CET jreher Updated box and position via API.
13. Sep 2019 10:30:00 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 12:41:31 CEST markus.moritz
25. Jul 2019 12:11:24 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:49 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:37 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:06:12 CEST Tobias Imported from Hamamatsu datasheet.