RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2806031261 - Archived data from Tue, 11. August 2020 17:39:18 CEST


This is all the information about APD 2806031261. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2806031261
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2316025481/2806031261
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: B08
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.7 V
Dark current: 9 nA
   
Screening Logistics:  
Available: No
Storage Box: 87
Position in Box: 22
EP1 batch: 76
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.5143469 V     T = -25 °C: 345.1248281 V
Voltage for Gain 150: T = +20 °C: 388.3542411 V     T = -25 °C: 352.5171265 V
Voltage for Gain 200: T = +20 °C: 392.7154782 V     T = -25 °C: 356.6514694 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.4496732 V-1     T = -25 °C: 4.865842878 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.683512028 V-1     T = -25 °C: 9.00431102 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.07372004 V-1     T = -25 °C: 16.03182395 V-1
Break-through voltage: T = +20 °C: 407.826137 V     T = -25 °C: 371.3211746 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:32 CET jreher Updated box and position via API.
03. Feb 2021 18:25:01 CET jreher Updated box and position via API.
11. Aug 2020 17:39:18 CEST jreher Updated APD characteristics via API.
25. Jun 2020 11:22:01 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:41 CET jreher Updated box and position via API.
27. Nov 2019 19:44:15 CET jreher Updated APD location via API.
25. Nov 2019 17:17:48 CET jreher Updated box and position via API.
13. Sep 2019 10:29:59 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:50:14 CEST markus.moritz
25. Jul 2019 12:11:24 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:49 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:37 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:06:09 CEST Tobias Imported from Hamamatsu datasheet.