RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0803007396 - Archived data from Tue, 11. August 2020 17:43:04 CEST


This is all the information about APD 0803007396. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0803007396
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2518028919/0803007396
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D10
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379.2 V
Dark current: 3.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 236
Position in Box: 23
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.0327163 V     T = -25 °C: 344.0340436 V
Voltage for Gain 150: T = +20 °C: 387.8284352 V     T = -25 °C: 351.348044 V
Voltage for Gain 200: T = +20 °C: 392.1353608 V     T = -25 °C: 355.4674383 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.607927958 V-1     T = -25 °C: 4.940056452 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.186532807 V-1     T = -25 °C: 9.180837182 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.43013711 V-1     T = -25 °C: 16.40943232 V-1
Break-through voltage: T = +20 °C: 407.1512028 V     T = -25 °C: 370.5177528 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:18:43 CET jreher Updated box and position via API.
11. Aug 2020 17:43:04 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:20 CEST jreher Updated box and position via API.
03. Apr 2020 10:06:40 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:28 CET jreher Updated box and position via API.
16. Jan 2020 12:06:09 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:19 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:30 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:37 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:36 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:10:50 CET jreher Updated APD location via API.
25. Nov 2019 17:29:13 CET jreher Updated box and position via API.
22. Oct 2019 16:36:28 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:17:09 CEST spankonin Updated APD location via API.
22. Jun 2016 15:22:36 CEST Tobias Imported from Hamamatsu datasheet.