RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2806031252 - Archived data from Tue, 11. August 2020 17:39:17 CEST


This is all the information about APD 2806031252. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2806031252
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A06
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 383.2 V
Dark current: 8.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 296
Position in Box: 38
EP1 batch: 76
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.6026642 V     T = -25 °C: 348.0200393 V
Voltage for Gain 150: T = +20 °C: 391.5146403 V     T = -25 °C: 355.5067094 V
Voltage for Gain 200: T = +20 °C: 395.9143737 V     T = -25 °C: 359.6997607 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.381402936 V-1     T = -25 °C: 4.874105581 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.441103981 V-1     T = -25 °C: 8.899108195 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.62627644 V-1     T = -25 °C: 15.7004313 V-1
Break-through voltage: T = +20 °C: 410.9517571 V     T = -25 °C: 374.6896538 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:48:07 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:59:32 CET jreher Updated box and position via API.
03. Feb 2021 18:25:01 CET jreher Updated box and position via API.
11. Aug 2020 17:39:17 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:44:15 CET jreher Updated APD location via API.
25. Nov 2019 17:17:48 CET jreher Updated box and position via API.
13. Sep 2019 10:29:59 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:49:00 CEST markus.moritz
25. Jul 2019 12:11:24 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:48 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:37 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:06:05 CEST Tobias Imported from Hamamatsu datasheet.