RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2806031245 - Archived data from Tue, 11. August 2020 17:26:51 CEST


This is all the information about APD 2806031245. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2806031245
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D06
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.7 V
Dark current: 7.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 44
Position in Box: 19
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.2837875 V     T = -25 °C: 343.051094 V
Voltage for Gain 150: T = +20 °C: 386.1121292 V     T = -25 °C: 350.4100125 V
Voltage for Gain 200: T = +20 °C: 390.4857061 V     T = -25 °C: 354.5410296 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.44692921 V-1     T = -25 °C: 4.798481924 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.275828815 V-1     T = -25 °C: 9.59444322 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.21643781 V-1     T = -25 °C: 14.84386499 V-1
Break-through voltage: T = +20 °C: 405.7639285 V     T = -25 °C: 369.4249759 V
   
Notes: foam


Version history

Time Author Change comment
22. Feb 2021 11:10:48 CET jreher Updated box and position via API.
05. Feb 2021 10:53:51 CET jreher Updated box and position via API.
03. Feb 2021 18:19:38 CET jreher Updated box and position via API.
11. Aug 2020 17:26:51 CEST jreher Updated APD characteristics via API.
04. Aug 2020 15:48:18 CEST jreher Updated box and position via API.
27. Nov 2019 19:36:48 CET jreher Updated APD location via API.
25. Nov 2019 17:17:47 CET jreher Updated box and position via API.
25. Nov 2019 17:14:24 CET jreher Updated box and position via API.
04. Jul 2019 11:11:35 CEST jreher Updated APD location via API.
13. Jun 2019 10:01:12 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:13:37 CET Tobias Corrected dark current unit.
21. Aug 2018 11:07:16 CEST markus.moritz
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:06:02 CEST Tobias Imported from Hamamatsu datasheet.