RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2806031230 - Archived data from Wed, 03. February 2021 18:24:58 CET


This is all the information about APD 2806031230. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2806031230
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 388 V
Dark current: 8.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 86
Position in Box: 50
EP1 batch: 75
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.1298288 V     T = -25 °C: 352.1403186 V
Voltage for Gain 150: T = +20 °C: 396.0068092 V     T = -25 °C: 359.6764362 V
Voltage for Gain 200: T = +20 °C: 400.394088 V     T = -25 °C: 363.8790629 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.524896794 V-1     T = -25 °C: 4.751580659 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.934761653 V-1     T = -25 °C: 9.659592771 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.83326113 V-1     T = -25 °C: 15.25794478 V-1
Break-through voltage: T = +20 °C: 415.660979 V     T = -25 °C: 379.054616 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:29 CET jreher Updated box and position via API.
03. Feb 2021 18:24:58 CET jreher Updated box and position via API.
11. Aug 2020 17:39:17 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:44:08 CET jreher Updated APD location via API.
25. Nov 2019 17:17:46 CET jreher Updated box and position via API.
13. Sep 2019 10:29:58 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:47:12 CEST markus.moritz
25. Jul 2019 12:11:43 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:44 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:36 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:05:59 CEST Tobias Imported from Hamamatsu datasheet.