RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2805031199 - Archived data from Tue, 11. August 2020 17:39:15 CEST


This is all the information about APD 2805031199. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2805031199
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C12
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.8 V
Dark current: 6.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 86
Position in Box: 39
EP1 batch: 75
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.1018145 V     T = -25 °C: 343.9229472 V
Voltage for Gain 150: T = +20 °C: 386.8985766 V     T = -25 °C: 351.2543213 V
Voltage for Gain 200: T = +20 °C: 391.2436576 V     T = -25 °C: 355.3515364 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.608709821 V-1     T = -25 °C: 5.002479561 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.116632095 V-1     T = -25 °C: 9.347333553 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.19424945 V-1     T = -25 °C: 14.79203123 V-1
Break-through voltage: T = +20 °C: 406.4760685 V     T = -25 °C: 369.9607574 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:28 CET jreher Updated box and position via API.
03. Feb 2021 18:24:57 CET jreher Updated box and position via API.
11. Aug 2020 17:39:15 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:44:07 CET jreher Updated APD location via API.
25. Nov 2019 17:17:45 CET jreher Updated box and position via API.
13. Sep 2019 10:29:40 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:43:38 CEST markus.moritz
25. Jul 2019 12:11:42 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:43 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:36 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:05:55 CEST Tobias Imported from Hamamatsu datasheet.