Subdetector specification:  
Serial: 2805031182
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D08
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379.1 V
Dark current: 5.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 86
Position in Box: 29
EP1 batch: 75
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.2894782 V     T = -25 °C: 344.1141101 V
Voltage for Gain 150: T = +20 °C: 387.0879032 V     T = -25 °C: 351.425343 V
Voltage for Gain 200: T = +20 °C: 391.4452423 V     T = -25 °C: 355.5003419 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.534997756 V-1     T = -25 °C: 4.922571538 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.88815963 V-1     T = -25 °C: 9.177086118 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.54904941 V-1     T = -25 °C: 16.35746677 V-1
Break-through voltage: T = +20 °C: 406.6174129 V     T = -25 °C: 370.0866 V
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:20:48 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:42 CET jreher Updated box and position via API.
05. Feb 2021 10:59:27 CET jreher Updated box and position via API.
03. Feb 2021 18:24:56 CET jreher Updated box and position via API.
11. Aug 2020 17:39:13 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:44:06 CET jreher Updated APD location via API.
25. Nov 2019 17:17:44 CET jreher Updated box and position via API.
13. Sep 2019 10:29:40 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:40:45 CEST markus.moritz
25. Jul 2019 12:11:41 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:42 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:36 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:05:50 CEST Tobias Imported from Hamamatsu datasheet.