RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2805031166 - Archived data from Fri, 05. February 2021 10:59:26 CET


This is all the information about APD 2805031166. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2805031166
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.8 V
Dark current: 5.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 86
Position in Box: 19
EP1 batch: 74
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.271113 V     T = -25 °C: 347.7633992 V
Voltage for Gain 150: T = +20 °C: 391.0707745 V     T = -25 °C: 355.1077694 V
Voltage for Gain 200: T = +20 °C: 395.4047006 V     T = -25 °C: 359.2253109 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.557330958 V-1     T = -25 °C: 4.651214772 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.051430007 V-1     T = -25 °C: 9.542798522 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.26880814 V-1     T = -25 °C: 15.18070025 V-1
Break-through voltage: T = +20 °C: 410.327776 V     T = -25 °C: 373.6944076 V
   
Notes:


Version history

Time Author Change comment
25. Sep 2021 16:11:30 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:01:17 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:59:26 CET jreher Updated box and position via API.
03. Feb 2021 18:24:55 CET jreher Updated box and position via API.
11. Aug 2020 17:39:11 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:44:05 CET jreher Updated APD location via API.
25. Nov 2019 17:17:43 CET jreher Updated box and position via API.
13. Sep 2019 10:29:39 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:36:45 CEST markus.moritz
25. Jul 2019 12:12:02 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:42 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:35 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:05:48 CEST Tobias Imported from Hamamatsu datasheet.