RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2805031150 - Archived data from Fri, 05. February 2021 10:59:25 CET


This is all the information about APD 2805031150. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2805031150
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B05
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 386.5 V
Dark current: 5.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 86
Position in Box: 10
EP1 batch: 74
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.0043172 V     T = -25 °C: 351.0836354 V
Voltage for Gain 150: T = +20 °C: 394.8679297 V     T = -25 °C: 358.6245872 V
Voltage for Gain 200: T = +20 °C: 399.2226557 V     T = -25 °C: 362.8367719 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.578641264 V-1     T = -25 °C: 4.798903817 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.145609973 V-1     T = -25 °C: 9.675199334 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.20937814 V-1     T = -25 °C: 15.43536416 V-1
Break-through voltage: T = +20 °C: 413.7842611 V     T = -25 °C: 377.9314417 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2022 09:58:23 CET oafedulidis Assigned to capsule by script
16. Dec 2021 13:43:04 CET oafedulidis Updated box and position via API.
05. Feb 2021 10:59:25 CET jreher Updated box and position via API.
03. Feb 2021 18:24:54 CET jreher Updated box and position via API.
11. Aug 2020 17:39:10 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:44:05 CET jreher Updated APD location via API.
25. Nov 2019 17:17:43 CET jreher Updated box and position via API.
13. Sep 2019 10:29:16 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:33:45 CEST markus.moritz
25. Jul 2019 12:12:01 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:41 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:35 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:05:44 CEST Tobias Imported from Hamamatsu datasheet.