RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2804031112 - Archived data from Fri, 05. February 2021 10:59:24 CET


This is all the information about APD 2804031112. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2804031112
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E14
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 383.9 V
Dark current: 12.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 86
Position in Box: 3
EP1 batch: 74
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.206592 V     T = -25 °C: 348.5267677 V
Voltage for Gain 150: T = +20 °C: 392.080087 V     T = -25 °C: 355.9969513 V
Voltage for Gain 200: T = +20 °C: 396.4542771 V     T = -25 °C: 360.1936287 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.521129576 V-1     T = -25 °C: 4.66031646 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.838710014 V-1     T = -25 °C: 9.33201277 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.47721522 V-1     T = -25 °C: 14.64744818 V-1
Break-through voltage: T = +20 °C: 411.81615 V     T = -25 °C: 375.5432406 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:24:49 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 11:13:09 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:59:24 CET jreher Updated box and position via API.
03. Feb 2021 18:24:53 CET jreher Updated box and position via API.
11. Aug 2020 17:39:09 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:44:04 CET jreher Updated APD location via API.
25. Nov 2019 17:17:42 CET jreher Updated box and position via API.
13. Sep 2019 10:29:16 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:32:12 CEST markus.moritz
25. Jul 2019 12:12:01 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:41 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:35 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:05:41 CEST Tobias Imported from Hamamatsu datasheet.