RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2804031103 - Archived data from Tue, 11. August 2020 17:39:07 CEST


This is all the information about APD 2804031103. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2804031103
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B10
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.6 V
Dark current: 14.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 85
Position in Box: 44
EP1 batch: 74
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.5985505 V     T = -25 °C: 348.7124416 V
Voltage for Gain 150: T = +20 °C: 392.4613457 V     T = -25 °C: 356.1840409 V
Voltage for Gain 200: T = +20 °C: 396.8215714 V     T = -25 °C: 360.388766 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.409332209 V-1     T = -25 °C: 4.935146911 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.544888473 V-1     T = -25 °C: 9.156289693 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.77261591 V-1     T = -25 °C: 16.28406275 V-1
Break-through voltage: T = +20 °C: 411.5880884 V     T = -25 °C: 375.2125583 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:21 CET jreher Updated box and position via API.
03. Feb 2021 18:24:50 CET jreher Updated box and position via API.
07. Oct 2020 12:17:13 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:34 CEST jreher Updated box and position via API.
11. Aug 2020 17:39:07 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:56 CET jreher Updated APD location via API.
25. Nov 2019 17:17:40 CET jreher Updated box and position via API.
13. Sep 2019 10:29:15 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:27:46 CEST markus.moritz
25. Jul 2019 12:12:00 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:36 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:34 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:05:39 CEST Tobias Imported from Hamamatsu datasheet.