RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2803031036 - Archived data from Tue, 08. December 2020 17:17:26 CET


This is all the information about APD 2803031036. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2803031036
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2803031036/2307024712
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E12
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 378.3 V
Dark current: 12 nA
   
Screening Logistics:  
Available: No
Storage Box: 85
Position in Box: 26
EP1 batch: 73
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.3453884 V     T = -25 °C: 343.2445608 V
Voltage for Gain 150: T = +20 °C: 386.1748918 V     T = -25 °C: 350.5835503 V
Voltage for Gain 200: T = +20 °C: 390.5483805 V     T = -25 °C: 354.6875701 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.523977695 V-1     T = -25 °C: 4.90358495 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.835715086 V-1     T = -25 °C: 9.060676161 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.50756036 V-1     T = -25 °C: 16.18649032 V-1
Break-through voltage: T = +20 °C: 406.4057059 V     T = -25 °C: 370.0991051 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:18 CET jreher Updated box and position via API.
03. Feb 2021 18:24:48 CET jreher Updated box and position via API.
08. Dec 2020 17:17:26 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:04 CEST jreher Updated box and position via API.
11. Aug 2020 17:39:04 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:55 CET jreher Updated APD location via API.
25. Nov 2019 17:17:39 CET jreher Updated box and position via API.
13. Sep 2019 10:28:55 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:21:54 CEST markus.moritz
25. Jul 2019 12:12:15 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:34 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:34 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:05:29 CEST Tobias Imported from Hamamatsu datasheet.