Show Hamamatsu Avalanche Photo Diode 2803031012 - Archived data from Fri, 29. January 2021 10:27:05 CET


This is all the information about APD 2803031012. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2803031012
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2803031012/2309024875
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C13
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.5 V
Dark current: 15 nA
   
Screening Logistics:  
Available: No
Storage Box: 85
Position in Box: 14
EP1 batch: 73
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.1444571 V     T = -25 °C: 344.9369466 V
Voltage for Gain 150: T = +20 °C: 387.9947379 V     T = -25 °C: 352.3028287 V
Voltage for Gain 200: T = +20 °C: 392.3713758 V     T = -25 °C: 356.4437823 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.581610332 V-1     T = -25 °C: 5.000172611 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.019242522 V-1     T = -25 °C: 9.266959879 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.9776465 V-1     T = -25 °C: 14.5357951 V-1
Break-through voltage: T = +20 °C: 408.2430081 V     T = -25 °C: 371.9675522 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:17 CET jreher Updated box and position via API.
03. Feb 2021 18:24:47 CET jreher Updated box and position via API.
29. Jan 2021 10:27:05 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:32 CEST jreher Updated box and position via API.
11. Aug 2020 17:39:01 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:54 CET jreher Updated APD location via API.
25. Nov 2019 17:17:38 CET jreher Updated box and position via API.
13. Sep 2019 10:28:54 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:17:26 CEST markus.moritz
25. Jul 2019 12:12:14 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:34 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:33 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:05:24 CEST Tobias Imported from Hamamatsu datasheet.