RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2802030936 - Archived data from Fri, 05. February 2021 10:59:11 CET


This is all the information about APD 2802030936. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2802030936
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D08
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.2 V
Dark current: 9.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 84
Position in Box: 28
EP1 batch: 71
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.2426966 V     T = -25 °C: 342.1806037 V
Voltage for Gain 150: T = +20 °C: 385.0495931 V     T = -25 °C: 349.4798194 V
Voltage for Gain 200: T = +20 °C: 389.4232603 V     T = -25 °C: 353.569209 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.56988851 V-1     T = -25 °C: 4.895842454 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.971097604 V-1     T = -25 °C: 9.185992501 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.82653975 V-1     T = -25 °C: 16.34792924 V-1
Break-through voltage: T = +20 °C: 405.1645195 V     T = -25 °C: 368.6299829 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:25:39 CEST oafedulidis Assigned to capsule by script
28. Apr 2021 13:27:29 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:59:11 CET jreher Updated box and position via API.
03. Feb 2021 18:24:41 CET jreher Updated box and position via API.
11. Aug 2020 17:38:55 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:44 CET jreher Updated APD location via API.
25. Nov 2019 17:17:34 CET jreher Updated box and position via API.
13. Sep 2019 10:28:30 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:04:01 CEST markus.moritz
25. Jul 2019 12:12:46 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:27 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:32 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:05:10 CEST Tobias Imported from Hamamatsu datasheet.