RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2802030934 - Archived data from Tue, 11. August 2020 17:38:54 CEST


This is all the information about APD 2802030934. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2802030934
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2802030934/2519029015
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E12
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 381.7 V
Dark current: 10.1 nA
   
Screening Logistics:  
Available: No
Storage Box: 84
Position in Box: 26
EP1 batch: 71
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.5604311 V     T = -25 °C: 346.1110885 V
Voltage for Gain 150: T = +20 °C: 389.3801727 V     T = -25 °C: 353.4859911 V
Voltage for Gain 200: T = +20 °C: 393.7181493 V     T = -25 °C: 357.6031562 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.422965897 V-1     T = -25 °C: 4.861580132 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.673762389 V-1     T = -25 °C: 9.05954262 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.13127837 V-1     T = -25 °C: 16.21755651 V-1
Break-through voltage: T = +20 °C: 408.7794599 V     T = -25 °C: 372.2672202 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:11 CET jreher Updated box and position via API.
03. Feb 2021 18:24:40 CET jreher Updated box and position via API.
11. Aug 2020 17:38:54 CEST jreher Updated APD characteristics via API.
25. Jun 2020 11:22:00 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:40 CET jreher Updated box and position via API.
27. Nov 2019 19:43:44 CET jreher Updated APD location via API.
25. Nov 2019 17:17:34 CET jreher Updated box and position via API.
13. Sep 2019 10:28:30 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:03:30 CEST markus.moritz
25. Jul 2019 12:12:46 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:27 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:32 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:05:10 CEST Tobias Imported from Hamamatsu datasheet.