RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2802030927 - Archived data from Wed, 03. February 2021 18:24:40 CET


This is all the information about APD 2802030927. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2802030927
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D10
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 378.3 V
Dark current: 10.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 84
Position in Box: 23
EP1 batch: 71
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.5792906 V     T = -25 °C: 343.6816006 V
Voltage for Gain 150: T = +20 °C: 386.3815518 V     T = -25 °C: 350.9890141 V
Voltage for Gain 200: T = +20 °C: 390.7236196 V     T = -25 °C: 355.087558 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.419174812 V-1     T = -25 °C: 5.056243808 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.603319883 V-1     T = -25 °C: 9.50048537 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.83945025 V-1     T = -25 °C: 15.00903656 V-1
Break-through voltage: T = +20 °C: 406.1929583 V     T = -25 °C: 369.8693659 V
   
Notes:


Version history

Time Author Change comment
25. Oct 2021 14:01:43 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:19 CEST jreher Updated box and position via API.
05. Feb 2021 10:59:10 CET jreher Updated box and position via API.
03. Feb 2021 18:24:40 CET jreher Updated box and position via API.
11. Aug 2020 17:38:54 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:43 CET jreher Updated APD location via API.
25. Nov 2019 17:17:34 CET jreher Updated box and position via API.
13. Sep 2019 10:28:00 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 13:02:24 CEST markus.moritz
25. Jul 2019 12:12:46 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:26 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:32 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:05:09 CEST Tobias Imported from Hamamatsu datasheet.