RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2801030873 - Archived data from Fri, 05. February 2021 10:59:08 CET


This is all the information about APD 2801030873. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2801030873
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 378.5 V
Dark current: 6.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 84
Position in Box: 7
EP1 batch: 71
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.952705 V     T = -25 °C: 342.9966674 V
Voltage for Gain 150: T = +20 °C: 385.7204582 V     T = -25 °C: 350.2974788 V
Voltage for Gain 200: T = +20 °C: 390.0330769 V     T = -25 °C: 354.3977074 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.673182725 V-1     T = -25 °C: 4.985735453 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.314959094 V-1     T = -25 °C: 9.267414485 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.52081225 V-1     T = -25 °C: 16.67886406 V-1
Break-through voltage: T = +20 °C: 404.7797012 V     T = -25 °C: 368.5805648 V
   
Notes:


Version history

Time Author Change comment
16. May 2022 13:33:12 CEST oafedulidis Updated box and position via API.
28. Apr 2021 13:29:35 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:59:08 CET jreher Updated box and position via API.
03. Feb 2021 18:24:38 CET jreher Updated box and position via API.
11. Aug 2020 17:38:51 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:42 CET jreher Updated APD location via API.
25. Nov 2019 17:17:33 CET jreher Updated box and position via API.
13. Sep 2019 10:27:59 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 12:57:03 CEST markus.moritz
25. Jul 2019 12:12:44 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:25 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:31 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:05:01 CEST Tobias Imported from Hamamatsu datasheet.