RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2801030871 - Archived data from Fri, 18. May 2018 12:05:01 CEST


This is all the information about APD 2801030871. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2801030871
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D13
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.9 V
Dark current: 1.17E-8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 84
Position in Box: 5
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:08 CET jreher Updated box and position via API.
03. Feb 2021 18:24:38 CET jreher Updated box and position via API.
07. Oct 2020 12:13:02 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:25 CEST jreher Updated box and position via API.
11. Aug 2020 17:38:51 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:42 CET jreher Updated APD location via API.
25. Nov 2019 17:17:33 CET jreher Updated box and position via API.
13. Sep 2019 10:27:59 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 12:56:32 CEST markus.moritz
25. Jul 2019 12:12:44 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:25 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:31 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:05:01 CEST Tobias Imported from Hamamatsu datasheet.