RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2801030858 - Archived data from Wed, 03. February 2021 18:24:35 CET


This is all the information about APD 2801030858. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2801030858
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E15
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.2 V
Dark current: 13.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 83
Position in Box: 48
EP1 batch: 70
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.2758047 V     T = -25 °C: 344.9889735 V
Voltage for Gain 150: T = +20 °C: 388.1146495 V     T = -25 °C: 352.3513708 V
Voltage for Gain 200: T = +20 °C: 392.502315 V     T = -25 °C: 356.4939884 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.563262689 V-1     T = -25 °C: 4.971242962 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.94204054 V-1     T = -25 °C: 9.253294061 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.84092027 V-1     T = -25 °C: 14.59498166 V-1
Break-through voltage: T = +20 °C: 408.3812209 V     T = -25 °C: 371.8332789 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:22:05 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:28 CET jreher Updated box and position via API.
05. Feb 2021 10:59:05 CET jreher Updated box and position via API.
03. Feb 2021 18:24:35 CET jreher Updated box and position via API.
11. Aug 2020 17:38:49 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:34 CET jreher Updated APD location via API.
25. Nov 2019 17:17:31 CET jreher Updated box and position via API.
13. Sep 2019 10:27:58 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 12:53:28 CEST markus.moritz
25. Jul 2019 12:13:01 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:20 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:31 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:04:58 CEST Tobias Imported from Hamamatsu datasheet.