RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2801030842 - Archived data from Wed, 16. June 2021 15:52:52 CEST


This is all the information about APD 2801030842. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2801030842
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D07
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.6 V
Dark current: 4.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 83
Position in Box: 36
EP1 batch: 70
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.441788 V     T = -25 °C: 346.0824409 V
Voltage for Gain 150: T = +20 °C: 389.3089941 V     T = -25 °C: 353.4728228 V
Voltage for Gain 200: T = +20 °C: 393.6835522 V     T = -25 °C: 357.5860829 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.45773306 V-1     T = -25 °C: 4.94077723 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.675432943 V-1     T = -25 °C: 9.122006499 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.15862899 V-1     T = -25 °C: 16.21158369 V-1
Break-through voltage: T = +20 °C: 408.8196158 V     T = -25 °C: 372.4695705 V
   
Notes:


Version history

Time Author Change comment
27. Jun 2022 12:42:46 CEST oafedulidis Assigned to capsule by script
16. Jun 2021 16:03:57 CEST oafedulidis Updated box and position via API.
16. Jun 2021 16:00:12 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:52:52 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:59:04 CET jreher Updated box and position via API.
03. Feb 2021 18:24:34 CET jreher Updated box and position via API.
11. Aug 2020 17:38:47 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:33 CET jreher Updated APD location via API.
25. Nov 2019 17:17:30 CET jreher Updated box and position via API.
10. Sep 2019 11:23:06 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 12:49:56 CEST markus.moritz
25. Jul 2019 12:13:00 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:19 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:30 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:04:52 CEST Tobias Imported from Hamamatsu datasheet.