RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2710030818 - Archived data from Wed, 03. February 2021 18:24:33 CET


This is all the information about APD 2710030818. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2710030818
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2710030818/2003021671
Unit: #1570 (barcode 1309016730)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 384 V
Dark current: 12.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 83
Position in Box: 30
EP1 batch: 70
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.4764509 V     T = -25 °C: 348.3830341 V
Voltage for Gain 150: T = +20 °C: 391.4311668 V     T = -25 °C: 355.8155191 V
Voltage for Gain 200: T = +20 °C: 395.8468886 V     T = -25 °C: 359.9709616 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.370352645 V-1     T = -25 °C: 4.721332287 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.493091576 V-1     T = -25 °C: 9.571718833 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.54131142 V-1     T = -25 °C: 15.14659437 V-1
Break-through voltage: T = +20 °C: 411.2487073 V     T = -25 °C: 375.3403812 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:03 CET jreher Updated box and position via API.
03. Feb 2021 18:24:33 CET jreher Updated box and position via API.
08. Dec 2020 17:09:36 CET jreher Assigned to capsule by script
06. Oct 2020 16:51:41 CEST jreher Updated box and position via API.
11. Aug 2020 17:38:46 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:33 CET jreher Updated APD location via API.
25. Nov 2019 17:17:30 CET jreher Updated box and position via API.
10. Sep 2019 11:23:06 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 12:48:31 CEST markus.moritz
25. Jul 2019 12:13:00 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:19 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:30 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:04:50 CEST Tobias Imported from Hamamatsu datasheet.