RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2710030815 - Archived data from Wed, 03. February 2021 18:24:33 CET


This is all the information about APD 2710030815. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2710030815
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E07
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.2 V
Dark current: 16.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 83
Position in Box: 27
EP1 batch: 70
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.1604428 V     T = -25 °C: 347.6742181 V
Voltage for Gain 150: T = +20 °C: 391.0156452 V     T = -25 °C: 355.0490169 V
Voltage for Gain 200: T = +20 °C: 395.3935519 V     T = -25 °C: 359.1776508 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.541662081 V-1     T = -25 °C: 5.041873978 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.925580477 V-1     T = -25 °C: 9.502369044 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.86447451 V-1     T = -25 °C: 15.00879645 V-1
Break-through voltage: T = +20 °C: 410.893209 V     T = -25 °C: 374.4159345 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:03 CET jreher Updated box and position via API.
03. Feb 2021 18:24:33 CET jreher Updated box and position via API.
11. Aug 2020 17:38:45 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:33 CET jreher Updated APD location via API.
25. Nov 2019 17:17:30 CET jreher Updated box and position via API.
10. Sep 2019 11:23:05 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 12:46:16 CEST markus.moritz
25. Jul 2019 12:12:59 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:19 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:30 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:04:49 CEST Tobias Imported from Hamamatsu datasheet.