RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2710030813 - Archived data from Wed, 03. February 2021 18:24:32 CET


This is all the information about APD 2710030813. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2710030813
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C13
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.7 V
Dark current: 12.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 83
Position in Box: 25
EP1 batch: 70
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.9268894 V     T = -25 °C: 348.3157302 V
Voltage for Gain 150: T = +20 °C: 390.8299586 V     T = -25 °C: 354.9892771 V
Voltage for Gain 200: T = +20 °C: 395.2353227 V     T = -25 °C: 359.1360781 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.570553886 V-1     T = -25 °C: 4.671166455 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.986922165 V-1     T = -25 °C: 9.472529625 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.91281008 V-1     T = -25 °C: 14.87881481 V-1
Break-through voltage: T = +20 °C: 410.6135168 V     T = -25 °C: 374.1363423 V
   
Notes:


Version history

Time Author Change comment
25. Sep 2021 16:11:28 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:01:15 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:59:02 CET jreher Updated box and position via API.
03. Feb 2021 18:24:32 CET jreher Updated box and position via API.
11. Aug 2020 17:38:45 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:32 CET jreher Updated APD location via API.
25. Nov 2019 17:17:29 CET jreher Updated box and position via API.
10. Sep 2019 11:23:05 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 12:45:47 CEST markus.moritz
25. Jul 2019 12:12:59 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:18 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:30 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:04:48 CEST Tobias Imported from Hamamatsu datasheet.