RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2710030801 - Archived data from Wed, 03. February 2021 18:24:31 CET


This is all the information about APD 2710030801. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2710030801
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C07
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.7 V
Dark current: 13.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 83
Position in Box: 14
EP1 batch: 69
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.6298127 V     T = -25 °C: 350.7626662 V
Voltage for Gain 150: T = +20 °C: 394.5380704 V     T = -25 °C: 358.227339 V
Voltage for Gain 200: T = +20 °C: 398.907209 V     T = -25 °C: 362.4260739 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.367209909 V-1     T = -25 °C: 4.940020674 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.458674914 V-1     T = -25 °C: 9.169901172 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.63502928 V-1     T = -25 °C: 14.38466966 V-1
Break-through voltage: T = +20 °C: 414.5209248 V     T = -25 °C: 377.7722816 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 10:39:57 CET oafedulidis Assigned to capsule by script
21. Apr 2021 11:02:31 CEST jreher Updated box and position via API.
05. Feb 2021 10:59:01 CET jreher Updated box and position via API.
03. Feb 2021 18:24:31 CET jreher Updated box and position via API.
11. Aug 2020 17:38:43 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:32 CET jreher Updated APD location via API.
25. Nov 2019 17:17:29 CET jreher Updated box and position via API.
10. Sep 2019 11:23:04 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 12:31:52 CEST markus.moritz
25. Jul 2019 12:13:16 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:18 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:30 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:04:45 CEST Tobias Imported from Hamamatsu datasheet.