RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2710030788 - Archived data from Wed, 03. February 2021 18:24:30 CET


This is all the information about APD 2710030788. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2710030788
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B06
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 388.6 V
Dark current: 12.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 83
Position in Box: 2
EP1 batch: 69
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.6638705 V     T = -25 °C: 352.5273036 V
Voltage for Gain 150: T = +20 °C: 396.4795873 V     T = -25 °C: 360.0598377 V
Voltage for Gain 200: T = +20 °C: 400.8118382 V     T = -25 °C: 364.2852492 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.404816159 V-1     T = -25 °C: 4.635391017 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.6532154 V-1     T = -25 °C: 9.282076498 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.98172974 V-1     T = -25 °C: 14.4681486 V-1
Break-through voltage: T = +20 °C: 416.3808147 V     T = -25 °C: 379.8904859 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:59:00 CET jreher Updated box and position via API.
03. Feb 2021 18:24:30 CET jreher Updated box and position via API.
11. Aug 2020 17:38:41 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:31 CET jreher Updated APD location via API.
25. Nov 2019 17:17:28 CET jreher Updated box and position via API.
10. Sep 2019 11:22:41 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 12:25:18 CEST markus.moritz
04. Sep 2019 12:25:06 CEST markus.moritz
25. Jul 2019 12:13:15 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:17 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:29 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:04:40 CEST Tobias Imported from Hamamatsu datasheet.