RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2710030778 - Archived data from Wed, 03. February 2021 18:24:27 CET


This is all the information about APD 2710030778. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2710030778
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2710030778/2313025271
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: F11
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.7 V
Dark current: 18.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 82
Position in Box: 43
EP1 batch: 69
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.4614404 V     T = -25 °C: 345.0099752 V
Voltage for Gain 150: T = +20 °C: 388.2501335 V     T = -25 °C: 352.3988097 V
Voltage for Gain 200: T = +20 °C: 392.5851465 V     T = -25 °C: 356.532735 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.487349197 V-1     T = -25 °C: 4.910302499 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.819633132 V-1     T = -25 °C: 9.130437894 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.43931133 V-1     T = -25 °C: 16.30240759 V-1
Break-through voltage: T = +20 °C: 407.8734507 V     T = -25 °C: 371.6029638 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:57 CET jreher Updated box and position via API.
03. Feb 2021 18:24:27 CET jreher Updated box and position via API.
11. Aug 2020 17:38:39 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:45:26 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:21 CET jreher Updated box and position via API.
27. Nov 2019 19:43:23 CET jreher Updated APD location via API.
25. Nov 2019 17:17:26 CET jreher Updated box and position via API.
10. Sep 2019 11:22:40 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 12:22:14 CEST markus.moritz
25. Jul 2019 12:13:14 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:12 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:29 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:04:37 CEST Tobias Imported from Hamamatsu datasheet.