RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2710030765 - Archived data from Wed, 03. February 2021 18:24:25 CET


This is all the information about APD 2710030765. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2710030765
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2710030765/2404026220
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.3 V
Dark current: 15.8 nA
   
Screening Logistics:  
Available: No
Storage Box: 82
Position in Box: 30
EP1 batch: 68
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.4185248 V     T = -25 °C: 345.0325665 V
Voltage for Gain 150: T = +20 °C: 388.2083934 V     T = -25 °C: 352.4082751 V
Voltage for Gain 200: T = +20 °C: 392.5414775 V     T = -25 °C: 356.5412047 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.510851718 V-1     T = -25 °C: 4.935539851 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.836518822 V-1     T = -25 °C: 9.089445869 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.476713 V-1     T = -25 °C: 16.25961777 V-1
Break-through voltage: T = +20 °C: 407.1671431 V     T = -25 °C: 371.2311067 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:55 CET jreher Updated box and position via API.
03. Feb 2021 18:24:25 CET jreher Updated box and position via API.
11. Aug 2020 17:38:36 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:45:23 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:20 CET jreher Updated box and position via API.
27. Nov 2019 19:43:22 CET jreher Updated APD location via API.
25. Nov 2019 17:17:25 CET jreher Updated box and position via API.
10. Sep 2019 11:22:21 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 11:47:56 CEST markus.moritz
25. Jul 2019 12:13:33 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:11 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:29 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:04:32 CEST Tobias Imported from Hamamatsu datasheet.