RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2710030759 - Archived data from Mon, 30. August 2021 14:06:48 CEST


This is all the information about APD 2710030759. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2710030759
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D01
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 386.2 V
Dark current: 7.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 82
Position in Box: 18
EP1 batch: 68
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.7823099 V     T = -25 °C: 349.8112041 V
Voltage for Gain 150: T = +20 °C: 393.6717531 V     T = -25 °C: 357.3500329 V
Voltage for Gain 200: T = +20 °C: 398.0459551 V     T = -25 °C: 361.5780834 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.653801338 V-1     T = -25 °C: 4.891976881 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.248060904 V-1     T = -25 °C: 9.028239519 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.48638819 V-1     T = -25 °C: 15.87834056 V-1
Break-through voltage: T = +20 °C: 412.1309155 V     T = -25 °C: 376.1483096 V
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 13:08:27 CET oafedulidis Assigned to capsule by script
30. Aug 2021 14:06:48 CEST oafedulidis Updated box and position via API.
03. May 2021 10:27:10 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:58:55 CET jreher Updated box and position via API.
03. Feb 2021 18:24:25 CET jreher Updated box and position via API.
11. Aug 2020 17:38:35 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:21 CET jreher Updated APD location via API.
25. Nov 2019 17:17:25 CET jreher Updated box and position via API.
10. Sep 2019 11:22:21 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 11:46:29 CEST markus.moritz
25. Jul 2019 12:13:32 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:10 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:28 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:04:30 CEST Tobias Imported from Hamamatsu datasheet.