RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2709030736 - Archived data from Wed, 16. June 2021 16:00:51 CEST


This is all the information about APD 2709030736. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2709030736
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D03
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.9 V
Dark current: 7.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 82
Position in Box: 10
EP1 batch: 68
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.9509442 V     T = -25 °C: 351.0457912 V
Voltage for Gain 150: T = +20 °C: 394.8327243 V     T = -25 °C: 358.4910278 V
Voltage for Gain 200: T = +20 °C: 399.2095281 V     T = -25 °C: 362.6401434 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.59601129 V-1     T = -25 °C: 4.875497031 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.106885005 V-1     T = -25 °C: 8.987087242 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.17337079 V-1     T = -25 °C: 15.97172487 V-1
Break-through voltage: T = +20 °C: 414.7057906 V     T = -25 °C: 377.959813 V
   
Notes:


Version history

Time Author Change comment
19. Nov 2021 13:05:32 CET oafedulidis Assigned to capsule by script
16. Jun 2021 16:04:40 CEST oafedulidis Updated box and position via API.
16. Jun 2021 16:00:51 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:53:36 CEST oafedulidis Updated box and position via API.
03. May 2021 10:27:09 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:58:53 CET jreher Updated box and position via API.
03. Feb 2021 18:24:24 CET jreher Updated box and position via API.
11. Aug 2020 17:38:33 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:21 CET jreher Updated APD location via API.
25. Nov 2019 17:17:24 CET jreher Updated box and position via API.
10. Sep 2019 11:22:20 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 11:33:19 CEST markus.moritz
25. Jul 2019 12:13:32 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:10 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:28 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:04:27 CEST Tobias Imported from Hamamatsu datasheet.