RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2709030734 - Archived data from Wed, 03. February 2021 18:24:23 CET


This is all the information about APD 2709030734. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2709030734
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C05
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.8 V
Dark current: 8.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 82
Position in Box: 8
EP1 batch: 68
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.1682773 V     T = -25 °C: 350.2409562 V
Voltage for Gain 150: T = +20 °C: 394.0312202 V     T = -25 °C: 357.6828962 V
Voltage for Gain 200: T = +20 °C: 398.4023133 V     T = -25 °C: 361.8351047 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.486709149 V-1     T = -25 °C: 4.751177596 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.838723967 V-1     T = -25 °C: 9.620227296 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.4338392 V-1     T = -25 °C: 15.32863813 V-1
Break-through voltage: T = +20 °C: 413.5372198 V     T = -25 °C: 376.8335261 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:27:09 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:58:53 CET jreher Updated box and position via API.
03. Feb 2021 18:24:23 CET jreher Updated box and position via API.
11. Aug 2020 17:38:33 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:20 CET jreher Updated APD location via API.
25. Nov 2019 17:17:24 CET jreher Updated box and position via API.
10. Sep 2019 11:22:20 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 11:32:47 CEST markus.moritz
25. Jul 2019 12:13:31 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:09 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:28 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:04:26 CEST Tobias Imported from Hamamatsu datasheet.