RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2709030728 - Archived data from Tue, 11. August 2020 17:38:32 CEST


This is all the information about APD 2709030728. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2709030728
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G05
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 386.2 V
Dark current: 9.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 82
Position in Box: 8
EP1 batch: 68
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.5801377 V     T = -25 °C: 349.615774 V
Voltage for Gain 150: T = +20 °C: 393.4411415 V     T = -25 °C: 357.0997703 V
Voltage for Gain 200: T = +20 °C: 397.7949745 V     T = -25 °C: 361.3002891 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.4023954 V-1     T = -25 °C: 4.632097133 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.585571063 V-1     T = -25 °C: 9.279697787 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.92396041 V-1     T = -25 °C: 14.52826397 V-1
Break-through voltage: T = +20 °C: 413.0667646 V     T = -25 °C: 376.5555582 V
   
Notes:


Version history

Time Author Change comment
14. Apr 2021 18:52:03 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:39 CET jreher Updated box and position via API.
05. Feb 2021 10:58:52 CET jreher Updated box and position via API.
03. Feb 2021 18:24:23 CET jreher Updated box and position via API.
11. Aug 2020 17:38:32 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:20 CET jreher Updated APD location via API.
25. Nov 2019 17:17:23 CET jreher Updated box and position via API.
10. Sep 2019 11:22:19 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 11:31:01 CEST markus.moritz
25. Jul 2019 12:13:31 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:09 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:28 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:04:24 CEST Tobias Imported from Hamamatsu datasheet.