RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2709030727 - Archived data from Wed, 03. February 2021 18:24:23 CET


This is all the information about APD 2709030727. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2709030727
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 388.3 V
Dark current: 9.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 82
Position in Box: 7
EP1 batch: 68
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.3181516 V     T = -25 °C: 352.1420662 V
Voltage for Gain 150: T = +20 °C: 396.240304 V     T = -25 °C: 359.67648 V
Voltage for Gain 200: T = +20 °C: 400.634207 V     T = -25 °C: 363.871084 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.454413283 V-1     T = -25 °C: 4.77994192 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.688215824 V-1     T = -25 °C: 9.708920304 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.17731836 V-1     T = -25 °C: 15.35200239 V-1
Break-through voltage: T = +20 °C: 415.8340075 V     T = -25 °C: 379.1867925 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:53:02 CEST oafedulidis Assigned to capsule by script
28. Apr 2021 13:28:11 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:58:52 CET jreher Updated box and position via API.
03. Feb 2021 18:24:23 CET jreher Updated box and position via API.
11. Aug 2020 17:38:32 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:20 CET jreher Updated APD location via API.
25. Nov 2019 17:17:23 CET jreher Updated box and position via API.
10. Sep 2019 11:22:19 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 11:30:43 CEST markus.moritz
25. Jul 2019 12:13:31 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:09 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:28 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:04:24 CEST Tobias Imported from Hamamatsu datasheet.