Show Hamamatsu Avalanche Photo Diode 2709030691 - Archived data from Tue, 11. August 2020 17:38:27 CEST
This is all the information about APD 2709030691. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2709030691 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | D10 |
Break-through voltage: | 413 V |
Voltage for Gain 100 (T=+25°C): | 384.5 V |
Dark current: | 10.4 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 81 |
Position in Box: | 31 |
EP1 batch: | 67 |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 26. Aug 2019 |
Sent for analysis after irradiation: | 02. Sep 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 28. Aug 2019 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 31. Aug 2019 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 384.7035346 V T = -25 °C: 348.9238847 V |
Voltage for Gain 150: | T = +20 °C: 392.5561216 V T = -25 °C: 356.3175307 V |
Voltage for Gain 200: | T = +20 °C: 396.8958582 V T = -25 °C: 360.4644941 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.386621501 V-1 T = -25 °C: 4.943155931 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.559202883 V-1 T = -25 °C: 9.202088056 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.87730256 V-1 T = -25 °C: 16.47169156 V-1 |
Break-through voltage: | T = +20 °C: 412.5936009 V T = -25 °C: 375.7963686 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 10:58:47 CET | jreher | Updated box and position via API. |
03. Feb 2021 18:24:18 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:38:27 CEST | jreher | Updated APD characteristics via API. |
27. Nov 2019 19:43:11 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:17:20 CET | jreher | Updated box and position via API. |
10. Sep 2019 11:21:39 CEST | jgrochowski | Updated APD batch assignment via API. |
04. Sep 2019 11:16:40 CEST | markus.moritz | |
25. Jul 2019 12:13:45 CEST | spankonin | Updated APD batch assignment via API. |
05. Jul 2019 13:47:03 CEST | jreher | Updated APD location via API. |
03. Jan 2019 00:13:27 CET | Tobias | Corrected dark current unit. |
24. May 2018 14:39:23 CEST | Tobias | Updated location to "Bochum". |
18. May 2018 12:04:15 CEST | Tobias | Imported from Hamamatsu datasheet. |