RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2709030680 - Archived data from Tue, 11. August 2020 17:38:25 CEST


This is all the information about APD 2709030680. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2709030680
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F13
Break-through voltage: 418 V
Voltage for Gain 100 (T=+25°C): 391.4 V
Dark current: 15.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 81
Position in Box: 22
EP1 batch: 66
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 390.9182024 V     T = -25 °C: 354.6098398 V
Voltage for Gain 150: T = +20 °C: 398.7220754 V     T = -25 °C: 362.1409548 V
Voltage for Gain 200: T = +20 °C: 403.0178392 V     T = -25 °C: 366.3547867 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.66691942 V-1     T = -25 °C: 4.622512542 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.520932004 V-1     T = -25 °C: 9.305330699 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.05002845 V-1     T = -25 °C: 14.69585807 V-1
Break-through voltage: T = +20 °C: 417.3266057 V     T = -25 °C: 380.9317178 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:46 CET jreher Updated box and position via API.
03. Feb 2021 18:24:17 CET jreher Updated box and position via API.
11. Aug 2020 17:38:25 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:10 CET jreher Updated APD location via API.
25. Nov 2019 17:17:20 CET jreher Updated box and position via API.
10. Sep 2019 11:21:38 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 11:11:44 CEST markus.moritz
25. Jul 2019 12:14:00 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:02 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:27 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:04:14 CEST Tobias Imported from Hamamatsu datasheet.