RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2709030676 - Archived data from Tue, 11. August 2020 17:38:24 CEST


This is all the information about APD 2709030676. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2709030676
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.3 V
Dark current: 12.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 81
Position in Box: 18
EP1 batch: 66
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.4016221 V     T = -25 °C: 348.8047052 V
Voltage for Gain 150: T = +20 °C: 392.267638 V     T = -25 °C: 356.2239302 V
Voltage for Gain 200: T = +20 °C: 396.6344702 V     T = -25 °C: 360.391789 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.482490678 V-1     T = -25 °C: 4.969061937 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.72143136 V-1     T = -25 °C: 9.191665431 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.20452945 V-1     T = -25 °C: 14.51118899 V-1
Break-through voltage: T = +20 °C: 412.2198038 V     T = -25 °C: 375.7466123 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:46 CET jreher Updated box and position via API.
03. Feb 2021 18:24:16 CET jreher Updated box and position via API.
11. Aug 2020 17:38:24 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:10 CET jreher Updated APD location via API.
25. Nov 2019 17:17:19 CET jreher Updated box and position via API.
10. Sep 2019 11:21:17 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 11:10:42 CEST markus.moritz
25. Jul 2019 12:14:00 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:02 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:26 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:04:14 CEST Tobias Imported from Hamamatsu datasheet.