RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2709030672 - Archived data from Wed, 07. October 2020 12:19:11 CEST


This is all the information about APD 2709030672. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2709030672
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2319025801/2709030672
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: F07
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.1 V
Dark current: 10.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 81
Position in Box: 16
EP1 batch: 66
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.4409727 V     T = -25 °C: 347.9881249 V
Voltage for Gain 150: T = +20 °C: 391.3267149 V     T = -25 °C: 355.3910627 V
Voltage for Gain 200: T = +20 °C: 395.7021986 V     T = -25 °C: 359.5404416 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.447119111 V-1     T = -25 °C: 4.953385564 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.635728317 V-1     T = -25 °C: 9.09598022 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.06516808 V-1     T = -25 °C: 16.25159209 V-1
Break-through voltage: T = +20 °C: 411.3092247 V     T = -25 °C: 374.8914919 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:45 CET jreher Updated box and position via API.
03. Feb 2021 18:24:16 CET jreher Updated box and position via API.
07. Oct 2020 12:19:11 CEST jreher Assigned to capsule by script
17. Aug 2020 15:54:05 CEST jreher Updated box and position via API.
11. Aug 2020 17:38:24 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:10 CET jreher Updated APD location via API.
25. Nov 2019 17:17:19 CET jreher Updated box and position via API.
10. Sep 2019 11:21:17 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 11:10:10 CEST markus.moritz
25. Jul 2019 12:14:00 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:02 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:26 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:04:13 CEST Tobias Imported from Hamamatsu datasheet.