RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2708030645 - Archived data from Wed, 03. February 2021 18:24:15 CET


This is all the information about APD 2708030645. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2708030645
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B10
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.5 V
Dark current: 12.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 81
Position in Box: 7
EP1 batch: 66
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.7867221 V     T = -25 °C: 349.8631021 V
Voltage for Gain 150: T = +20 °C: 393.6433588 V     T = -25 °C: 357.3351433 V
Voltage for Gain 200: T = +20 °C: 397.985736 V     T = -25 °C: 361.5091118 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.64378274 V-1     T = -25 °C: 4.886424213 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.240892671 V-1     T = -25 °C: 8.990048125 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.48426373 V-1     T = -25 °C: 16.0036753 V-1
Break-through voltage: T = +20 °C: 411.5145201 V     T = -25 °C: 375.2432269 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:44 CET jreher Updated box and position via API.
03. Feb 2021 18:24:15 CET jreher Updated box and position via API.
11. Aug 2020 17:38:22 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:09 CET jreher Updated APD location via API.
25. Nov 2019 17:17:19 CET jreher Updated box and position via API.
10. Sep 2019 11:21:17 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 11:08:00 CEST markus.moritz
25. Jul 2019 12:13:59 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:01 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:26 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:04:12 CEST Tobias Imported from Hamamatsu datasheet.