RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2708030641 - Archived data from Wed, 07. October 2020 12:17:06 CEST


This is all the information about APD 2708030641. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2708030641
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2708030641/2304024422
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C09
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.5 V
Dark current: 12.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 81
Position in Box: 3
EP1 batch: 66
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.0815947 V     T = -25 °C: 345.6608211 V
Voltage for Gain 150: T = +20 °C: 388.9314484 V     T = -25 °C: 353.0362034 V
Voltage for Gain 200: T = +20 °C: 393.2936157 V     T = -25 °C: 357.1677391 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.585455232 V-1     T = -25 °C: 4.690283831 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.985665724 V-1     T = -25 °C: 9.445462501 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.9560604 V-1     T = -25 °C: 14.98834742 V-1
Break-through voltage: T = +20 °C: 408.7858369 V     T = -25 °C: 372.3087313 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:44 CET jreher Updated box and position via API.
03. Feb 2021 18:24:15 CET jreher Updated box and position via API.
07. Oct 2020 12:17:06 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:32 CEST jreher Updated box and position via API.
11. Aug 2020 17:38:22 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:09 CET jreher Updated APD location via API.
25. Nov 2019 17:17:18 CET jreher Updated box and position via API.
10. Sep 2019 11:21:16 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 11:04:23 CEST markus.moritz
25. Jul 2019 12:13:59 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:47:01 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:26 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:04:12 CEST Tobias Imported from Hamamatsu datasheet.