RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0802007360 - Archived data from Thu, 15. April 2021 16:43:12 CEST


This is all the information about APD 0802007360. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0802007360
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 0717006646/0802007360
Unit: #2022 (barcode 1309021802)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: E10
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 388.1 V
Dark current: 31.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 190
Position in Box: 20
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.052539 V     T = -25 °C: 351.6944526 V
Voltage for Gain 150: T = +20 °C: 395.9452175 V     T = -25 °C: 359.2314106 V
Voltage for Gain 200: T = +20 °C: 400.322516 V     T = -25 °C: 363.4635997 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.542243045 V-1     T = -25 °C: 4.919445583 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.926942904 V-1     T = -25 °C: 9.019211067 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.87499525 V-1     T = -25 °C: 15.82269366 V-1
Break-through voltage: T = +20 °C: 415.0264342 V     T = -25 °C: 378.0382002 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 13:59:47 CEST jreher Updated box and position via API.
15. Apr 2021 16:58:08 CEST jreher Updated box and position via API.
15. Apr 2021 16:43:12 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:12:51 CET jreher Updated box and position via API.
11. Aug 2020 17:34:51 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:02:40 CET jreher Updated APD location via API.
25. Nov 2019 17:25:50 CET jreher Updated box and position via API.
16. Aug 2019 10:43:32 CEST spankonin Updated APD batch assignment via API.
13. Aug 2019 12:17:28 CEST jreher Updated APD location via API.
09. Aug 2019 17:00:09 CEST spankonin Updated APD batch assignment via API.
09. Aug 2019 14:17:59 CEST markus.moritz
22. Jun 2016 15:22:35 CEST Tobias Imported from Hamamatsu datasheet.