RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2708030634 - Archived data from Tue, 08. December 2020 17:17:18 CET


This is all the information about APD 2708030634. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2708030634
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2419027404/2708030634
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: F12
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.2 V
Dark current: 14.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 80
Position in Box: 46
EP1 batch: 66
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.1128941 V     T = -25 °C: 349.3455592 V
Voltage for Gain 150: T = +20 °C: 392.9551057 V     T = -25 °C: 356.7972839 V
Voltage for Gain 200: T = +20 °C: 397.3251601 V     T = -25 °C: 360.961664 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.562078565 V-1     T = -25 °C: 4.755741868 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.009100573 V-1     T = -25 °C: 9.590926428 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.98815985 V-1     T = -25 °C: 15.25240361 V-1
Break-through voltage: T = +20 °C: 412.3596391 V     T = -25 °C: 375.9206277 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:41 CET jreher Updated box and position via API.
03. Feb 2021 18:24:12 CET jreher Updated box and position via API.
08. Dec 2020 17:17:18 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:03 CEST jreher Updated box and position via API.
11. Aug 2020 17:38:20 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:01 CET jreher Updated APD location via API.
25. Nov 2019 17:17:17 CET jreher Updated box and position via API.
10. Sep 2019 11:21:16 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 11:02:34 CEST markus.moritz
25. Jul 2019 12:13:58 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:56 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:26 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:04:10 CEST Tobias Imported from Hamamatsu datasheet.